§ 10.3. Plan content.
Erosion and sediment control plans shall contain architectural and engineering drawings, maps, assumptions, calculations, and narrative statements as needed to describe accurately the proposed development of the site and the measures planned to meet the Basic Control Objectives. Plan content may vary to meet the needs of the specific site conditions, but must show, at a minimum, the best management practices (BMP's) which will be used to control site erosion during and after construction.
10.31
Some BMPs include:
Mulching
Sodding
Holding tanks
Sedimentation control basins
Clean up practices
Detention basins
Porous pavements
Infiltration systems
Channel storage
Recreational area storage
Diversion structure
Ponds
Aeration of soils
Minimize disturbed land area
Minimize the duration of exposure of natural elements
Retain natural vegetation